Showing posts with label 2. Show all posts
Showing posts with label 2. Show all posts

Monday, February 10, 2014

The arched top door Minster Oh Side 2 is underway

I have planed down, squared, and scribed the white oak for the opposite side of the door, and have glued and clamped it in place. I want to make sure this has plenty of dry time, so this will sit for at least a day, if not more, before I trim it.
After trimming, I will begin the sanding/staining/finishing process.

Read More..

Saturday, January 25, 2014

Project video posted! Build 2 small crates out of a single 2x4


Read More..